What is the current cost of HS2?
HS2: Update on Current Costs
The much-anticipated High Speed 2 (HS2) rail line has faced significant cost overruns in recent years. The original budget for the London-Birmingham leg of the project, set in 2019, was £54-£66 billion. However, according to updated figures from HS2 Ltd., the estimated cost has now risen to £67-£81.7 billion in current prices.
This increase in cost is attributed to a number of factors, including:
- Rising construction costs: The global pandemic and supply chain disruptions have led to significant increases in the cost of materials and labor.
- Design changes: The project has undergone several design revisions, which have added to the overall cost.
- Inflation: General inflation has also contributed to the cost increase.
Despite the cost overruns, HS2 remains a crucial infrastructure project for the United Kingdom. The high-speed rail line is expected to reduce travel times between London and major cities in the Midlands and the North, boosting economic growth and connectivity.
The government has pledged its commitment to the HS2 project and has stated that it will provide the necessary funding to complete the line. However, the increased costs are likely to put pressure on the project’s timeline and budget. It remains to be seen whether the project can be delivered on time and within budget.