How long is the East West Line train ride?
The East-West Line: Duration of a Train Ride
Singapore’s East-West Line (EWL) is an extensive rail network that traverses the length of the island, connecting the eastern and western suburbs with the downtown core. The majority of the line runs at elevated levels, providing commuters with scenic views of the cityscape and surrounding neighborhoods.
However, at three specific sections, the EWL dips below ground. These subterranean segments occur between the Kallang and Redhill stations, Bedok and Kembangan stations, and Expo and Changi Airport station. This design allows the line to navigate through densely populated areas and under waterways.
The complete journey from one end of the EWL to the other takes approximately 85 minutes. This duration includes the time spent in stations, as well as the travel time between them. The line’s length, combined with its elevated and underground sections, contributes to the relatively extended travel time.
Commuters should note that during peak hours, train frequency on the EWL can be significantly higher, resulting in shorter waiting times and overall faster travel times. Additionally, the line is connected to several other MRT lines, allowing for seamless transfers and greater connectivity.
In summary, the East-West Line train ride takes approximately 85 minutes to complete, considering both elevated and underground sections. While the duration may be longer than some other MRT lines, the EWL offers reliable and efficient transportation throughout Singapore.
#Commuter#Eastwestline#TrainridetimeFeedback on answer:
Thank you for your feedback! Your feedback is important to help us improve our answers in the future.